Case Study
North Yorkshire Plant Full Site Lighting
Site Facts
- Location: North Yorkshire, UK
- Large Steel Structures Manufacturing facility
- Multiple work areas – different lighting needs
- Manufacturing, External & Task Lighting
- Fabrication
- 24/6 Operational Hours
- 312 Days per year
- Over 250 Members of Staff
- 501 Luminaires
- 854,703 kWhrs of electricity on Lighting P.A
The lighting issues on site…
- Over 20% of the Lighting faulty
- Nearly 90% of the Lighting units 15 years old +
- High Failure rates – difficult relamp process
- High Maintenance costs for Lamp/Ballast Replacement
- Restricted Access to Lighting units due to Plant Machinery
- Insufficient Light Levels with Poor Uniformity
- Depreciated Light Lux levels from 20-150 lx
- High Energy Usage
- 854,703 kWhrs on Lighting per Annum
- No Lighting Control
- Difficult to maintain Emergency Lighting system
The Challenge…
- Design and install an LED lighting system for the site
- Work only at weekends so that production was not affected
- Reduce the Lighting Energy Consumption by 50%
- Minimize the maintenance requirements for years to come
- Increase Light Levels with enhanced Lighting Uniformity
- Introduce a Consistent Cool White Led colour spectrum
- Photocells to all External Lighting
- Increased current Lux Levels by 100-300 lx (area dependent)
- Install and easy to maintain Emergency LED Lighting System
The Result…
-
- An LED lighting system for the manufacturing area of the site
- 501 LED luminaires have been installed
- Designed, managed and delivered by LYNXled
- Fast track project delivery over 4 weekends
- Lighting Energy Consumption reduced by 54.9%
- 469,320 kWhrs saved P.A – 2,346,600 kWhrs over 5 years
- All products are a minimum L80 50,000 hrs compliant
- Enhanced Lighting Uniformity
- Photocells to all External Lighting
- Increased Lux Levels (min 25%) both internally and externally